Water/Wastewater Master Servicing Plan


Consultant:WSP Canada Inc.

Percentage complete/Status: 30 per cent complete; estimated to be complete in the summer of 2027

Dollars spent: $8,080 to date, $430,022.50 planned to be spent total

The Town of Collingwood is preparing the 2026 Water and Wastewater Master Servicing Plan to guide long-term planning and investment in the town’s drinking water and wastewater systems through 2051.

Fire Services Master Plan

Started: Aug. 3, 2023

Consultant: Emergency Management Group

Percentage complete/Status: On hold

Dollars spent to date: $44,743.89

The Town of Collingwood is creating a 10-year community-driven Fire Services Master Plan to guide operational improvements and enhance service delivery of fire services. Public consultation was held in the summer of 2023 and a preliminary version of the plan completed, but town staff confirmed this month it was put on hold due to “concurrent priorities,” with no firm plans on when the work will be picked up again.

Downtown Parking Study

Started: Sept. 3, 2025

Consultant: EXP Consulting

Percentage complete/Status: Complete, waiting on presentation to council this September

Dollars spent: $38,552.26 to date, with $74,560 planned to be spent total.

The Town of Collingwood is undertaking a Downtown Parking Study to better understand how parking is currently being used and how it can be improved in Collingwood’s downtown.

Master Mobility and Transportation Plan

Started: January 2024

Consultant: EXP Consulting

Percentage complete/Status: 85 per cent complete, but council sent the consultant back to do more study. The final plan is expected to be presented to council in October.

Dollars spent to date: $562,447

The town’s master mobility and transportation plan makes recommendations on how the town can improve the active transportation network, transit and roads to accommodate growth predicted by 2051.

Cultural Heritage Emergency Management Policy

Started: Nov. 14, 2025

Consultant: NPG Planning Solutions Inc.

Percentage complete/Status: Report to council expected on Sept. 14

Dollars spent: $14,338.57 to date, with $16,295 planned to be spent total

The Town of Collingwood is currently developing a Cultural Heritage Emergency Management Policy to help guide the town and property owners in preparing for and responding to emergencies and disasters that may impact heritage properties.

Climate Adaptation Plan

Started: October 2025

Consultant: Amethyst Infrastructure Management

Percentage complete/Status: Report to council expected Sept. 28

Dollars spent: $85,642.22 to date, with $109,857.40 planned to be spent total (plan is supported by 70 per cent funding from the Federation of Canadian Municipalities’ Green Municipal Fund)

The Town of Collingwood is currently developing a Climate Adaptation Plan to help the town understand local climate risks and plan practical actions to protect people, services and natural spaces.

Stormwater Management Master Plan

Started: Phase 1 2019, Phase 2 2023

Consultant: Greenland Consulting Engineers

Percentage complete/Status: 99 per cent/waiting on council ratification on Sept. 14

Dollars spent: $463,807.54 to date, with $467,889.76 planned to be spent total

The Town of Collingwood’s stormwater management plan studied which areas of town are/will be most hard-hit by flooding, and offered a plan on how it can be addressed.

Long-Term Financial Plan

Started: April 28, 2025

Consultant: Watson & Associates Economists Ltd.

Percentage complete/Status: Plan is expected to go before council’s committee of the whole on Sept. 14

Dollars spent: $151,311.77

The Town of Collingwood’s long-term strategic financial plan seeks to create a multi-year plan for the town’s finances, so budgets aren’t just done year-to-year without a long-term public forecast.

District Energy Business Case

Started: Sept. 5, 2025

Consultant: FVB Energy Inc.

Percentage complete/status: 95 per cent

Dollars spent: $106,354.50 to date, with $110,362.50 planned to be spent total (50 per cent is funded through a Federation of Canadian Municipalities grant)

The purpose of the study is to determine the business viability of a district energy system for the Town of Collingwood. A district energy system is a network of underground pipes that pump steam, hot water, and/or chilled water to multiple buildings providing heating and cooling from a central plant.